Lines running
11 of 12
Line 4 paused for a planned die change
We build maintenance, plant knowledge, purchasing and safety records into the ERP, maintenance and quality systems you already run.
Lines running
11 of 12
Line 4 paused for a planned die change
Work orders open
38
Six opened today when a sensor crossed its limit
Next likely failure
Press 4
Bearing temperature rising, inspect within 3 days
Spare parts below minimum
22
Reorders drafted for 19 of them
The people who know the machines are leaving faster than they are replaced. We build the record of what they know, searchable at the machine.
Manufacturers, process plants, mines and quarries, and the suppliers and maintenance firms around them.
Hard to hire
of manufacturers expected ongoing difficulty attracting and keeping workers
Non-fatal accidents
of all those at work happen in manufacturing
Fatal accidents
of all those at work happen in manufacturing
1.9 million jobs
in manufacturing could go unfilled by 2033
Hard to hire
of manufacturers expected ongoing difficulty attracting and keeping workers
Non-fatal accidents
of all those at work happen in manufacturing
Fatal accidents
of all those at work happen in manufacturing
1.9 million jobs
in manufacturing could go unfilled by 2033
Machine states, alarms and work orders read from the sensors and the maintenance system you already run. The next likely failure is flagged while the line still runs, and the procedure, the permit and the part are at the machine.
Shift BLive, Monday 07:52
Paused
Press 4
Running
Machining centre 2
Gearbox housings, 400 pieces
D. Ionescu
Paused
Press 4
Die change, back on the line at 09:40
M. Novak
Fault
Welding cell 1
Wire feed stopped, work order opened
L. Moreau
Running
Laser cutter
Brackets from 8 mm plate
S. Varga
Parts held by how critical they are, reserved before the job and reordered before they run out. Supplier confirmations and dates are read into the ERP, so a late delivery shows against the plan before it stops a line.
The store todaySpare parts, bay A
Racks by fill120 locations
Bay A, racks 1 to 12Level 1 at the floor
From the first call to software that runs, in six steps, with the price agreed before any work starts.
Talk through how maintenance, purchasing, quality or safety run today, and where the hours and the output go.
A written map of every system, handoff and manual step, from the alarm or the purchase order to the closed work order or the paid invoice.
What we build first, what it replaces and what it costs, agreed before any work starts. It usually starts with unplanned downtime on the lines that cost most to stop.
Built inside your ERP, maintenance system, machine data and quality records, without changing the control systems that run the plant.
Reviewed with the maintenance, production and quality leads, then switched on one line or one site at a time.
We watch every run, fix what breaks and add the next piece when you are ready.
Anything that touches the machines, safety or quality stays with your engineers: what gets stopped, repaired, released or signed off. The software keeps the schedules, the checks and the record, and the models read the sensor trends, the manuals and the supplier documents and say what they see.
ERP, the maintenance system, sensors and machine alarms, quality and safety systems, supplier portals, spreadsheets and email.
On the first call we go through how maintenance and purchasing run on that line with you: which systems it touches, where the work waits and which steps are done by hand. The call ends with a written map of what we would build first, and the price is agreed in the plan before any work starts.
No. We build on top of the systems you already run and connect them, so your people keep working where they work today.
It reads what your sensors, alarms and historians already record. It does not change how the machines are controlled, and anything that would goes to an engineer.
Only the engineers on your project, and only in the systems you open for them. You decide what each automation can read and what it can change, and every run is logged.
It depends on the work. The plan names what goes live first, when, and the price, before any work starts.